from Dan. His replies can't go to the list. On Wed, Feb 05, 2003 at 04:37:52PM -0500, Kathleen M. Brosemer wrote:
Dan, any objection to dismantling the clients on Wednesday night? Can you and Jim schedule being there and doing that?
Count me in.
Here's the draft (it's a bit neater in the word processor, hoping you can follow the bullets...)
nyurgh... those apostrophes really get you too... reformatting... ;) I won't delete items I'm not commenting on for Jim's benefit.
Carpeting plan: Weds. Feb 19th, 7-9 pm Five volunteers, including D. Brosemer, J. Dew, K. Brosemer * dismantle 5 client systems, fax, 3 printers, video system, remove to desk in IS, tarp and label
Easy.
* label server room off-limits to workers
Razor wire good enough? Can anyone lend us a Doberman? :) Seriously, though, all I need is a nice long length of double-sided velcro to make it hard to do damage apart from deliberately.
* box contents of stack 2, unbolt stack from wall, move against stack 1, place boxes on shelves Thurs. Feb. 20th, 9:30-11:30 am K. Brosemer and A. Peters * move desk 2 to in front of brochure rack, supply electricity to desk 2 * place tool box, vacuum cleaner under desk 2 * place kitchen supplies, bowls, silverware, coffee/tea supplies on desk 2. * box contents of desk 5 and store in walk-in closet Thurs. Feb. 20th, 7-9 pm Five volunteers * dismantle desk 1, leave in place * box loose matter from rear third of room, move to IS behind counter * move furniture from rear third (desks 3,4,9, two bookshelves, four cabinets) to IS, place in paint stacks as compactly as possible. Hide three best office chairs in paint stacks. * box contents of stacks 3&4, move to IS * move stacks 3&4 to IS Fri. Feb 21st 7-9 pm. Five volunteers * box loose matter from middle third of room to rear third * move furniture from middle third to rear third (desks 5,6,7,8, two lateral file cabinets) * move desk 1 parts to rear third.
* remove telephone cable that goes nowhere from behind file cabinets * move little fishies to atop the cabinet outside the bathroom take power from kamino
Saturday Feb 22nd, five or six volunteers in each of three-hour shifts starting at 9 am, work in this sequence:
[ chopping this up for readability ]
* remove loose carpeting in first third, cut and place carpeting in first third, glue carpeting.
* move stack 2, bolt to wall, reshelve books * remove old carpeting in middle third, scrape and clean floor, vacuum * cut and place carpeting in middle third, glue carpeting
* move stacks 3&4 to front third and place in position. * return books to stacks 3&4 * return desk 1 parts to front, reassemble * return desks 5,6,7,8 to middle
Do things dry this fast? Is that why we're re-stocking shelves during this instead of waiting until Tues/Thurs for Ashley to do it?
* return file cabinets to middle * return boxed loose matter to middle * remove old carpeting from rear third of room, scrape and clean floor, vacuum * cut and place carpeting in rear third, glue carpeting
* move furniture from IS to rear third of room * move loose matter from IS to rear third * move fax, computers, printers to desks 5,6,7,8,9
check.
* clean up front of room, food and drink area, wash dishes * move desk 2 back into position * move video from IS to desk 2 Advance work: Ensure a phone is working and accessible throughout, place phone and phone book on Kamino.
Two phone jacks are in IS, one by each network jack. I can rewire the phone in 30sec to have the fax run on one if you want to keep it going between Wed and Sat... the other can have the voice line (it's already set up for that).
Put first aid kit in washroom. Decide which vacuum is most useful and make sure it's there. Ensure adequate supply of t.p. and face tissues, hand towels, soap, vacuum bags if needed, Tidy up IS to extent possible.
Looks peachy. -Dan -- "Burnished gallows set with red Caress the fevered, empty mind Of man who hangs bloodied and blind To reach for wisdom, not for bread." -- Deoridhe Grimsdaughter ---------- End Forwarded Message ----------
--- Begin Message ---
- To: "Kathleen M. Brosemer" <kathie@cleannorth.org>
- Subject: Re: a carpeting plan
- From: Dan Brosemer <odin@cleannorth.org>
- Date: Thu, 6 Feb 2003 00:51:21 -0500
- Battlestar-galactica-date: 43649 centons, 21 microns, 11.11 lutefisk
- Cc: officers@lists.cleannorth.org, tlynham@nrcan.gc.ca, jdew@yggdrasil.ca
- In-reply-to: <1693.198.103.94.108.1044481072.squirrel@sabe.cleannorth.org>
- References: <1693.198.103.94.108.1044481072.squirrel@sabe.cleannorth.org>
- Resent-date: Thu, 6 Feb 2003 02:03:35 -0500
- Resent-from: odin@cleannorth.org
- Resent-message-id: <200302060703.h1673ZdB006515@mace.cleannorth.org>
- Resent-to: officers-list@mace.cleannorth.org
- User-agent: Mutt/1.4i
On Wed, Feb 05, 2003 at 04:37:52PM -0500, Kathleen M. Brosemer wrote: > Dan, any objection to dismantling the clients on Wednesday night? Can you > and Jim schedule being there and doing that? Count me in. > Here's the draft (it's a bit neater in the word processor, hoping you can > follow the bullets...) nyurgh... those apostrophes really get you too... reformatting... ;) I won't delete items I'm not commenting on for Jim's benefit. > Carpeting plan: > > Weds. Feb 19th, 7-9 pm > > Five volunteers, including D. Brosemer, J. Dew, K. Brosemer > * dismantle 5 client systems, fax, 3 printers, video system, remove to > desk in IS, tarp and label Easy. > * label server room off-limits to workers Razor wire good enough? Can anyone lend us a Doberman? :) Seriously, though, all I need is a nice long length of double-sided velcro to make it hard to do damage apart from deliberately. > * box contents of stack 2, unbolt stack from wall, move against > stack 1, place boxes on shelves > > Thurs. Feb. 20th, 9:30-11:30 am > > K. Brosemer and A. Peters > * move desk 2 to in front of brochure rack, supply electricity to > desk 2 > * place tool box, vacuum cleaner under desk 2 > * place kitchen supplies, bowls, silverware, coffee/tea supplies on > desk 2. > * box contents of desk 5 and store in walk-in closet > > Thurs. Feb. 20th, 7-9 pm > > Five volunteers > * dismantle desk 1, leave in place > * box loose matter from rear third of room, move to IS behind counter > * move furniture from rear third (desks 3,4,9, two bookshelves, four > cabinets) to IS, place in paint stacks as compactly as possible. Hide > three best office chairs in paint stacks. > * box contents of stacks 3&4, move to IS > * move stacks 3&4 to IS > > Fri. Feb 21st 7-9 pm. > Five volunteers > * box loose matter from middle third of room to rear third > * move furniture from middle third to rear third (desks 5,6,7,8, two > lateral file cabinets) > * move desk 1 parts to rear third. * remove telephone cable that goes nowhere from behind file cabinets * move little fishies to atop the cabinet outside the bathroom take power from kamino > Saturday Feb 22nd, five or six volunteers in each of three-hour shifts > starting at 9 am, work in this sequence: [ chopping this up for readability ] > * remove loose carpeting in first third, cut and place carpeting in > first third, glue carpeting. > * move stack 2, bolt to wall, reshelve books > * remove old carpeting in middle third, scrape and clean floor, vacuum > * cut and place carpeting in middle third, glue carpeting > * move stacks 3&4 to front third and place in position. > * return books to stacks 3&4 > * return desk 1 parts to front, reassemble > * return desks 5,6,7,8 to middle Do things dry this fast? Is that why we're re-stocking shelves during this instead of waiting until Tues/Thurs for Ashley to do it? > * return file cabinets to middle > * return boxed loose matter to middle > * remove old carpeting from rear third of room, scrape and clean > floor, vacuum > * cut and place carpeting in rear third, glue carpeting > * move furniture from IS to rear third of room > * move loose matter from IS to rear third > * move fax, computers, printers to desks 5,6,7,8,9 check. > * clean up front of room, food and drink area, wash dishes > * move desk 2 back into position > * move video from IS to desk 2 > > Advance work: > > Ensure a phone is working and accessible throughout, place phone and phone > book on Kamino. Two phone jacks are in IS, one by each network jack. I can rewire the phone in 30sec to have the fax run on one if you want to keep it going between Wed and Sat... the other can have the voice line (it's already set up for that). > Put first aid kit in washroom. > Decide which vacuum is most useful and make sure it's there. > Ensure adequate supply of t.p. and face tissues, hand towels, soap, vacuum > bags if needed, > Tidy up IS to extent possible. Looks peachy. -Dan -- "Burnished gallows set with red Caress the fevered, empty mind Of man who hangs bloodied and blind To reach for wisdom, not for bread." -- Deoridhe GrimsdaughterAttachment: pgp00001.pgp
--- End Message ---
Description: PGP signature
- Prev by Date: Re: a carpeting plan
- Next by Date: progress report - Carpeting
- Previous by thread: Re: a carpeting plan
- Next by thread: progress report - Carpeting
- Index(es):